This is a photo of the original upstairs toilet (September 2008)
Old Hot-Air Blower Heating Vents - sandwiched between two dividing walls - upstairs toilet
Dividing wall being removed between upstairs toilet & cloakroom/store
The Dividing wall & Heating Ducting removed
The old Heating Steel Chimney Vent & Heating Ducting removed, leaving a Hole to be filled in!
20mm Steel Rod & Angle Iron Frame being made - to 'Make-Good' the Concrete Slab with Reinforced Concrete repair
Almost ready for Shuttering & Filling In
Shuttering in place ready for concrete mix
another view of the reinforcing rods & frame that is to effect the repair of the floor in the Toilet
Heather mixing the concrete
Hole reinforced, shuttered & filled in - now having a final leveling & skim
Dividing wall removed - none of this brickwork & beams are 'Support Walls - as the main roof is supported by massive RSJ Beams above
We decided to keep the original Ceiling Height & existing ceiling joists for the New partitioned second UpstairsToilet
Old Cupboard doorway being bricked up, in readiness for New Doorway Entrance to the Toilets
Old doorway 'Lintel Supported' whilst infil brickwork is being done
View from where the New Additional Toilet is located, showing the New Walls & Stud-work going up
View from where the New DDA Toilet isto be located, showing the New Walls & Stud-work going up
View from where the New DDA Toilet isto be located, showing the New Walls & Stud-work going up
View from where the New DDA Toilet isto be located, sho
Old doorway being bricked up,making way for a Central Entrance to the New Toilets
New Entrance to the Toilets Area
New Dividing Wall on the Left-hand side of the New Toilet Block
New Dividing Wall on the Left-hand side of the New Toilet Block - being panelled with recycled panels
All of the wood & panelling was 'second-hand' donated / recycled materials
Extractor Fan Outlet Vents being Installed for the Toilets
New Walls & Stud-Panelling
New Walls & Stud-Panelling
New Walls & Stud-Panelling
New Walls - Plastered - Plus our New Ceiling Access Panel - Wiring & Light fitting fitted
New Walls - Plastered - Plus our New Ceiling Access Panel - Wiring & Light fitting fitted
View from inside the New DDA Toilet - Plastering completed
View from inside the New DDA Toilet - Plastering completed
View from inside the New DDA Toilet - Plastering completed
Recycled Wall & Floor Tiles being 'Dressed', with the old grout & cement being removed ready for laying in the New Toilets.
Recycled Wall & Floor Tiles being 'Dressed', with the old grout & cement being removed ready for laying in the New Toilets